Since 1939

Rinconada Water Treatment Plant

Image of #79
Image of 79 1
Image of 79 2
Image of 79a
Image of 79 1
Image of 79 2
< >
 

Rinconada Water Treatment Plant

Amoroso served as the General Contractor for the seismic retrofitting of the four-story water control building by adding shear walls on two floors. After asbestos and lead abatement, demolition of the majority of the interior on both floors took place, making way for new operation control rooms, lab space, upgraded MEP systems, improved bathrooms, and locker rooms. Structural upgrades were also made to the pump station and the meter shop.

Client: Santa Clara Valley
Delivery Method: Design-Bid-Build
Location: Los Gatos, CA
 

News


 
 
Home > Our Projects > Rinconada Water Treatment Plant
Northern California
1875 S. Grant Street, Suite 200
San Mateo, CA 94402
P 650 654 1900
F 650 654 9002
Southern California
2600 Michelson Drive, Suite 600
Irvine, CA 92612
P 714 433 2326
F 714 433 2329
Copyright 2015-2026, SJ Amoroso Construction Co., LLC All Rights Reserved.    News    Employee Login    Policies    Site Map   |   Web Development by SunStar Media.
Site Navigation
Printed: August 4, 2026 Page: www.sjamoroso.com/project-rinconada-water-treatment-plant-79.htm