Rear Berths 136-139 Terminal Buildings & Main Gate

Amoroso served as the General Contractor for the multi-phased, LEED Gold project consisted of eight separate structures spread across approximately 47 acres. All of the work took place within a fully operational terminal at the Port of Los Angeles. There was constantly non-construction related trucks and vehicles passing in, out and through the sites, as well as four other adjacent construction projects which required constant coordination between Amoroso, other general contractors, the Port representatives, and their clients that were active within the terminal.

Client: Port of Los Angeles
Delivery Method: Design-Bid-Build
Location: San Pedro, CA
 
Home > Our Projects > Rear Berths 136-139 Terminal Buildings & Main Gate
Northern California
1875 S. Grant Street, Suite 200
San Mateo, CA 94402
P 650 654 1900
F 650 654 9002
Southern California
2600 Michelson Drive, Suite 600
Irvine, CA 92612
P 714 433 2326
F 714 433 2329
Copyright 2015-2026, SJ Amoroso Construction Co., LLC All Rights Reserved.    News    Employee Login    Policies    Site Map   |   Web Development by SunStar Media.
Site Navigation
Printed: August 4, 2026 Page: www.sjamoroso.com/project-rear-berths-136-139-terminal-buildings-main-gate-69.htm