|
SJ Amoroso Construction Co., LLC
|
Since 1939
|
|
|
|
Amoroso served as the General Contractor for the construction of a cast-in-place concrete parking structure, a two-story central fire station and an Emergency Operations Center that connected to the fire station with a second-story pedestrian bridge. The exterior skin is comprised of metal panels, glass curtain walls, plaster, and stone tile. Access flooring covers the entire building, utilizing an underfloor HVAC system and containing miles of electrical, data, and systems wiring. The project totaled 221,000 SF.