Since 1939

Welcome to SJ Amoroso Construction, Inc.

Completed Projects

  • CSU Dominguez Hills Cain Library

    CSU Dominguez Hills Cain Library

    The Cain Library project involved the construction of a 140,000 Sf, five-story addition with connections to...Los Angeles, CA
  • Irvine Valley College Life Science Building

    Irvine Valley College Life Science Building

    This was a takeover project from EDGE development that went out of business. The project, which was in the...Irvine, CA
  • NASA Ames Biosciences Research Facility

    NASA Ames Biosciences Research Facility

    Amoroso Construction completed construction of the new, two-story 40,000 SF Ames Biosciences Research Facility...
  • East Contra Costa BART Extension

    East Contra Costa BART Extension

    The East Contra Costa Bart Extension Project (eBART) connects the existing Bay Point BART Station to Antioch,...Contra Costa, CA
  • South Region High School #8

    South Region High School #8

    2018 International Interior Design Association Calibre Design Award Winner The Los Angeles Unified School...Maywood, CA
  • San Francisco Ambulance Deployment Facility (ADF)

    San Francisco Ambulance Deployment Facility (ADF)

    Amoroso served as General Contractor for the construction of the new, LEED Platinum, 58,451 SF, four-story...San Francisco, CA
  • Los Angeles City College Student Union

    Los Angeles City College Student Union

    The Los Angeles City College Student Union was a design build project awarded to Amoroso on a competitive...Los Angeles, CA
  • Scripps College New Residence Hall

    Scripps College New Residence Hall

    The design of the New Residence Hall remains consistent with the Mediterranean style of architecture popular...Claremont, CA

Latest News

Amoroso Construction / HED Team Awarded $84M UC Davis Seismic Imp. Project

Image of Press Release #74
June 1, 2023

[Redwood Shores, CA] Amoroso Construction and our architectural partner HED (Harley Ellis Devereaux), are thrilled to announce our award for the 5-building, $84 seismic design-build improvement project at UC Davis.

While this project does not include obvious changes to the building, it includes critical life-safety seismic plus fire/life-safety improvements, plus significant ... Read More >
Northern California
390 Bridge Parkway
Redwood City, CA 94065
P 650 654 1900
F 650 654 9002
Southern California
275 East Baker Street, Suite B
Costa Mesa, CA 92626
P 714 433 2326
F 714 433 2329
Copyright 2015, SJ Amoroso Construction Co., LLC All Rights Reserved.    News    Employee Login    Policies    Site Map   |   Web Development by SunStar Media.
Site Navigation
Printed: March 29, 2024 Page: www.sjamoroso.com/